An off-line approach to calculate missing PMU data in a distribution network

Ahmed Amirul Arefin, Syed Zahurul Islam*, Muhammad Saufi Bin Kamarudin, Rosli Bin Omar, Rohaiza Binti Hamdan, Jasim Uddin

*Corresponding author for this work

Research output: Contribution to journalConference articlepeer-review

Abstract

The Phasor Measurement Unit (PMU) is now very popular in the power system since it can ensure the maximum reliability of the microgrid by creating an intensive monitoring system. This paper discusses a coherent off-line approach to recovering missing PMU data to elevate the reliability of the distribution network. The proposed scheme categorized the missing data from its current location position and offered a specific solution for each category. To validate the performance of the proposed system, a modified IEEE 30 bus system has been selected since it represents the typical PETRONAS plant and, more relevant to the industrial application, is designed and originated from the PMU data from that model. The outcome shows that the proposed scheme is well suited to the island detection system. Also, it can recover the overall 30% PMU data from the scheme calculation, which will be able to increase the entire reliability index of the distribution network.

Original languageEnglish
Article number040006
JournalAIP Conference Proceedings
Volume2564
Issue number1
DOIs
Publication statusPublished - 26 Oct 2023
Event3rd International Conference on Electrical and Electronics Engineering 2021: Versatility of Electrical and Electronics Engineering Solutions for Sustainable Future, ICON3E 2021 - Virtual, Online, Malaysia
Duration: 6 Sept 20217 Sept 2021

Cite this